| 1. | An algorithm of automatically arranging node in drawing pert network chart 网络图自动布点算法的研究 |
| 2. | Documentation symbols and conventions for data , program and system flowcharts , program network charts and system resources charts 数据程序系统工艺流程图程序网络图和系统资源图等用文件符号和惯例 |
| 3. | Then a production plan model which integrates network plan technology and mrp is brought forward on the basis of standardization of network chart 在对网络图进行规范化的基础上,提出了一种结合网络计划技术和mrp的生产计划模型。 |
| 4. | Information processing - documentation symbols and conventions for data , program and systems flowcharts , program network charts , and system resources charts 信息处理.数据程序和系统流程图程序网络图和系统资源图的文件编制符号和约定 |
| 5. | The principle of network planning technique and network chart drawing method are illustrated and compared with gantt chart analysis method in this paper 摘要介绍了网络计划技术的原理和网络图的绘制,并与传统的甘特图分析方法进行了比较。 |
| 6. | Information processing - documentation symbols and conventions for data , program and system flowcharts , program network charts and system resources charts 信息处理数据流程图程序流程图系统流程图程序网络图和系统资源图的文件编制符号及约定 |
| 7. | Simultaneously , it has also suggested that the network chart with double time - axes should be applied in the course of the recognition and analysis for schedule deviation 分析了项目运行过程中进度偏差识别和分析方法;提出使用双代号时标网络图进行进度偏差识别与分析。 |
| 8. | In uses in front of the software the usual use stick plot or the thick line network chart , after use the software to work thin , two not good comparisons , thus frugal time not too good quantification 在使用软件之前通常使用柱状图或粗线条网络图,使用软件后工作更细化,两者不好比较,从而节约的时间不太好量化。 |
| 9. | Design and realize the modeling method on the basis of network chart , emerging the choice structure and parallel structure , and automatically routing the execution of task by configuring the executed condition and next condition 摘要提出了一种基于有向网络图的建模方法,将选择结构和并行结构合并在一起,并在任务的配置过程中配置任务的执行条件和后置条件以路由任务的执行。 |
| 10. | The primary innovations are followed : 1 > it discusses the actuality and development of the technology of project items planning management summarily . it aims at the illogicality of defining " fuzzy mum or min " in the previous study of fuzzy network chart , and puts forward new definitions about " fuzzy mum or min " 概要论述了工程项目计划管理技术的现状与发展,针对以前模糊网络图研究中存在的模糊最大(最小)定义的不合理性,提出了新的模糊最大(最小)定义,在此基础上,建立了模糊时间参数的定义和计算。 |